Hunting International

Despite their expertise the team struggled with scheduling inefficiencies, deliveries were consistently late by as much as 60 to 75 days on average – the cause? – working on the wrong jobs at the wrong time leading to bottlenecks and frustration.
Read Success Story

Alloy Engineering

By implementing Protected Flow Manufacturing (PFM) from LillyWorks it introduced Threat-Level Priorities to the team at Alloy, giving them real-time visibility into what jobs need immediate attention and what jobs to work on next
Read Success Story

Arch Global Precision

Learn how PFM helped the Cutting Tool Division of Arch Global Precision make production planning and execution a strength at their UltraDex facility.
Read Success Story

Gasbarre Products, Inc.

Learn how Protected Flow Manufacturing brought stability and predictability to Gasbarre’s operations helping them reach a year-to-date on-time delivery average of over 94%.
Read Success Story

Graphicast, Inc.

Learn how a switch from traditional shop floor production scheduling to PFM helped Graphicast reduce unexpected backlog and improve lead times.
Read Success Story

Manes Machine

Learn how a switch from traditional shop floor scheduling to Protected Flow Manufacturing helped Manes Machine get more done than ever.
Read Success Story

Streamline Industries

Learn how a switch from traditional shop floor scheduling to Protected Flow Manufacturing helped Streamline Industries improve on-time deliveries.
Read Success Story