Hunting International
Despite their expertise the team struggled with scheduling inefficiencies, deliveries were consistently late by as much as 60 to 75 days on average – the cause? – working on the wrong jobs at the wrong time leading to bottlenecks and frustration.
Read Success Story
Alloy Engineering
By implementing Protected Flow Manufacturing (PFM) from LillyWorks it introduced Threat-Level Priorities to the team at Alloy, giving them real-time visibility into what jobs need immediate attention and what jobs to work on next
Read Success Story
Arch Global Precision
Learn how PFM helped the Cutting Tool Division of Arch Global Precision make production planning
and execution a strength at their UltraDex facility.
Read Success Story
Gasbarre Products, Inc.
Learn how Protected Flow Manufacturing brought stability and predictability to Gasbarre’s
operations helping them reach a year-to-date on-time delivery average of over 94%.
Read Success Story
Graphicast, Inc.
Learn how a switch from traditional shop floor production scheduling to PFM helped Graphicast
reduce unexpected backlog and improve lead times.
Read Success Story
Manes Machine
Learn how a switch from traditional shop floor scheduling to Protected Flow Manufacturing helped
Manes Machine get more done than ever.
Read Success Story
Streamline Industries
Learn how a switch from traditional shop floor scheduling to Protected Flow Manufacturing helped
Streamline Industries improve on-time deliveries.
Read Success Story
Not sure which solution is right for you?






