Protected Flow Manufacturing @ VMCAUG in Ontario, Canada
Dave Luckner presenting Protected Flow Manufacturing today at VMCAUG in Ontario, Canada. Results that allow manufacturers to deliver on time, in less time, everytime – and it proves it’s work – put it to the test, it’s ready for your toughest challenge! What’s Next: Read Cindy Jutras’ report of how LillyWorks is challenging the long held… READ MORE
Protected Flow Manufacturing – a Revolutionary New Approach
These articles are portions of a lecture presented to APICS by our friend Gene Caiola. In our last segment titled “Finite Scheduling – Not So Easy To Be Successful” we left off after realizing that Finite Scheduling was a bit more work than it was worth… Protected Flow Manufacturing – a Revolutionary New Approach The… READ MORE
Protected Flow Manufacturing @ EASTEC
Come by and visit Dave Luckner and Protected Flow Manufacturing today at EASTEC in Springfield, MA – we’re in booth #5828
Production Scheduling and the Danger of Prioritizing by Due Date
This is the second of four blogs on Production Scheduling and the 3 Shop Floor Fundamentals. In the first, I described how I met a VP of Operations who, in spite of having an ERP with scheduling functionality in it, is struggling to answer these questions, which I call the 3 Shop Floor Fundamentals: In this… READ MORE
Production Scheduling: Release the Thoroughbred in your Shop
Manufacturing and thoroughbred race horses – what do they have in common? During a tour of the Kentucky Derby Museum a couple of years ago, I learned that many of the fastest thoroughbred race horses have what are considered to be abnormally large hearts. Secretariat, the famous 1973 Triple Crown winner, who won the last… READ MORE